ALAN SRL has successfully managed an environmental recovery and a landfill for inert waste. The site on which the project was carried out was an disused industrial area which included sheds covered with asbestos-cement for the production of bricks and tanks for the collection of production sewage. After careful cleaning, the infrastructures were demolished and the three old quarries in the sorroundings, which were used for clay extraction were filled.  Two of them were brought back to the countryside level through environmental recovery, while the third one, by the creation of a ladfill for inert waste.